Prev | Current Page 115 | Next

Rose, Achilles

"Napoleon's Campaign in Russia Anno 1812"

Napoleon, informed of this fact on November 28th., at
once ordered General Eble to construct the bridge and on November 25th., at
1 o'clock in the morning, he issued orders to Oudinot to have his corps
ready for crossing the river. The moment had arrived when the great
engineer, the venerable General Eble, was to crown his career by an
immortal service.
He had saved six cases containing tools, nails, clamps, and all kinds of
iron pieces needed for the construction of trestle bridges. In his profound
foresight he had also taken along two wagon-loads of charcoal, and he had
under his command 400 excellent pontooneers upon whom he could reply
absolutely.
General Eble has been described as the model of an officer, on account of
his imposing figure and his character.
Eble and Larrey were the two men whom the whole army never ceased to
respect and to obey, even when they demanded things which were almost
impossible. General Eble then with his 400 men departed in the evening of
November 24th. for Borisow, followed by the clever General Chasseloup who
had some sappers with him, but without their tools. General Chasseloup was
a worthy associate of the illustrious chief of the pontooneers. They
marched all night, arriving at Borisow on the 25th., at 5 o'clock in the
morning. There they left some soldiers in order to deceive the Russians by
making them believe that the bridge was to be constructed below Borisow.
Eble with his pontooneers, however, marched through swamps and woods along
the river as far as Studianka, arriving there during the afternoon of the
25th.


Pages:
103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127
Kidprotect Akogo Nasze Dzieci Dzieci Niczyje Niechciane i Zapomniane